The T5 Travelodge was the first hotel built to meet the additional demand for hotel rooms following the completion of Heathrow Airport's Terminal 5. The new 6-floor hotel comprises 297 bedrooms with a 150-seat café/bar on the ground floor.

The hotel met the demanding Travelodge '2010 specification' for a high quality finish. It features a light and welcoming ground floor interior that is achieved by an extensively glazed façade.

The installation of the frame was completed 2 weeks ahead of schedule by P.A.W. and this ensured that the time-critical project was on track for opening.

The development enjoys regular use by business travellers and tourists alike and benefits from strong transportation links to Heathrow's Terminal 5 - including access to the London underground.

The efficiency and speed of P.A.W. Structures was an important factor in delivering our high profile hotel close to Terminal 5. We were impressed at the design, manufacturing and installation stages and by the P.A.W. team's attention to detail.

Les Nicholls, Regional Director, John Sisk Group

To find out how P.A.W. can help you and your business get in touch today.

Project details

Client

Travelodge

Total Contract Value

Circa £13m

P.A.W. Contract Value

Circa £2m

Frame Details

  • 9,491m² total floor area
  • 6-storey frame
  • Enabled fit out to commence whilst still working on floors above

Programme Duration

Frames erected in 15 weeks

Main Contractor

John Sisk Group

Architect

RHWL

Engineer

Halcrow